Construction Project Scheduler - Lead Scheduler, Ohio
Construction Project Scheduler - Lead Scheduler, Ohio
-
Ohio, USA
-
Posted: 06/08
-
Save
Description
We are currently hiring a Field Schedulers for our client in Columbus, OH
Responsibilities
The Scheduler / Senior Scheduler will monitor and document construction progress, identify, track and assist in resolution of construction issues/conflicts. They will monitor, review and report to the Project Manager and or clients, the schedule status of the project with regard to compliance to the construction contract specifications and other documents. Scheduler will create Cost and Resource Loaded scheduling, gather data, validate and incorporate it into the project schedule, analyze schedule impacts and recommend corrective action to be taken in order to mitigate/avoid cost and schedule overruns. They will also prepare clear and concise scheduling/update analysis reports, including project indicators on a regular basis.
Support corporate initiatives, accumulating historical performance data, for use in a realistic planning and forecasting of future projects.
Effectively interface and participate in difficult conversations with entire project team (Owner, General, AE, Subcontractors and Suppliers)
In addition to proven proficiency with Oracle Primavera and Microsoft Project, the Sr. Scheduler will be required to utilize other software tools to validate and interact with project scheduling tools (i.e., Excel, Adobe, Bluebeam, Synchro, Vico, NetPoint, etc.)
Collect, input, validate and analyze progress in the master schedule, using P6.
Assess that project objectives, both short and long term, are being met.
Incorporate detail fragments and other sequencing modifications as required.
Prepare and publish reports on a regular basis.
Qualifications
Bachelor's degree in engineering or construction management preferred; or equivalent professional training and experience with high school diploma.
Minimum of two years of related construction experience.
Must be a planner and know how to build.
Microsoft Office and Primavera scheduling software experience.
Proficient in cost, Client and equipment resource loaded schedule.
Proficient in gathering, maintaining, reporting and analyzing schedule data.
Strong time management and communication skills.
Must be able to travel and work on a job site.
Job Competencies:
Safety
Technical Skills
Risk Management / Change Management
Quality Control & ISO / Lean Understanding
Administration & Communication
Innovation & Technology
Cost Control
Leadership
Responsibilities
The Scheduler / Senior Scheduler will monitor and document construction progress, identify, track and assist in resolution of construction issues/conflicts. They will monitor, review and report to the Project Manager and or clients, the schedule status of the project with regard to compliance to the construction contract specifications and other documents. Scheduler will create Cost and Resource Loaded scheduling, gather data, validate and incorporate it into the project schedule, analyze schedule impacts and recommend corrective action to be taken in order to mitigate/avoid cost and schedule overruns. They will also prepare clear and concise scheduling/update analysis reports, including project indicators on a regular basis.
Support corporate initiatives, accumulating historical performance data, for use in a realistic planning and forecasting of future projects.
Effectively interface and participate in difficult conversations with entire project team (Owner, General, AE, Subcontractors and Suppliers)
In addition to proven proficiency with Oracle Primavera and Microsoft Project, the Sr. Scheduler will be required to utilize other software tools to validate and interact with project scheduling tools (i.e., Excel, Adobe, Bluebeam, Synchro, Vico, NetPoint, etc.)
Collect, input, validate and analyze progress in the master schedule, using P6.
Assess that project objectives, both short and long term, are being met.
Incorporate detail fragments and other sequencing modifications as required.
Prepare and publish reports on a regular basis.
Qualifications
Bachelor's degree in engineering or construction management preferred; or equivalent professional training and experience with high school diploma.
Minimum of two years of related construction experience.
Must be a planner and know how to build.
Microsoft Office and Primavera scheduling software experience.
Proficient in cost, Client and equipment resource loaded schedule.
Proficient in gathering, maintaining, reporting and analyzing schedule data.
Strong time management and communication skills.
Must be able to travel and work on a job site.
Job Competencies:
Safety
Technical Skills
Risk Management / Change Management
Quality Control & ISO / Lean Understanding
Administration & Communication
Innovation & Technology
Cost Control
Leadership
Highlights
-
Company nameBlackRock Resources LLC
-
Job positionConstruction Project Scheduler - Lead Scheduler
Safety Tips
Beware of ads written with poor grammar or spelling.
More info about this ad
Construction Project Scheduler - Lead Scheduler has been posted in the Columbus Construction & Manufacturing category on Locanto.
If you’re still wanting to browse, there is so much to explore in the Construction & Manufacturing category! Take a look at the ads Service Technician, Chillicothe, Service Technician ($20 PH starting), Chillicothe and Field Service Technician in Washington Court House to discover more of what you’re looking for. In total, we have 8 ads in Construction & Manufacturing in Columbus on Locanto classifieds.
There are more ads within a 10 mi radius for this category. If you want to view those ads, click here.